Construction

Kidbrooke Ph3

The construction of the basement and podiums to Blocks A & B, including energy centre below block A. Superstructure to block A apartments comprising of 4 no. Blocks ranging from 11 to 16 floors. Construction of 3 storey in situ concrete substation Block D.

Location
Kidbrooke, London, SE3 9YG
Contract value
£18.5 Million
Client

Kidbrooke Ph3

Scope of Works

  • Existing site preparation
  • Construction of access road, foul and surface water drainage
  • Road construction for Cambert Way into podium and basement and Tudway Road to basement to highway specification
  • Sheet piling attendance
  • Concrete foundation piling attendance to Plot B Temporary propping
  • Retaining wall construction