Construction
Kidbrooke Ph3
The construction of the basement and podiums to Blocks A & B, including energy centre below block A. Superstructure to block A apartments comprising of 4 no. Blocks ranging from 11 to 16 floors. Construction of 3 storey in situ concrete substation Block D.
- Location
- Kidbrooke, London, SE3 9YG
- Contract value
- £18.5 Million
- Client


Kidbrooke Ph3
Scope of Works
- Existing site preparation
- Construction of access road, foul and surface water drainage
- Road construction for Cambert Way into podium and basement and Tudway Road to basement to highway specification
- Sheet piling attendance
- Concrete foundation piling attendance to Plot B Temporary propping
- Retaining wall construction